Virtual-chassis static mode

what is the correct procedure to put two switches
on stack statically?
thank you all

Steps:

  1. Assign a Chassis ID to each switch. Must be different for each switch belonging to the Virtual Chassis
  2. Assign a Chassis Group ID and priority (highest selected master)
  3. Configure VFL Mode (Auto or static)
  4. Reload the switches

Example:
Switch 1:
sw1 (6900-A)-> virtual-chassis chassis-group 1
sw1 (6900-A)-> virtual chassis-id 1 configured-chassis-priority 200
sw1 (6900-A)-> show configuration vcm-snapshot chassis-id 1
sw1 (6900-A)-> write memory
sw1 (6900-A)-> reload from working no rollback-timeout
Confirm Activate (Y/N):

Switch 2:
sw2 (6900-B)-> virtual-chassis chassis-id 1 configured-chassis-id 2
sw2 (6900-B)-> virtual-chassis chassis-group 1
sw2 (6900-B)-> write memory
WARNING - Virtual chassis topology change detected. Chassis 1 missing!
Configuration associated with missing chassis will be erased permanently!
Confirm to continue (Y/N): y
sw2 (6900-B)-> reload from working no rollback-timeout
Confirm Activate (Y/N) : y

Switch 1:
sw1 (6900-A)-> virtual-chassis vf-link-mode static
sw1 (6900-A)-> virtual-chassis chassis-id 1 vf-link 0 create
sw1 (6900-A)-> virtual-chassis chassis-id 1 vf-link 0 member-port 1/2/1
sw1 (6900-A)-> virtual-chassis chassis-id 1 vf-link 0 member-port 1/2/2
sw1 (6900-A)-> write memory

Switch 2:
sw2 (6900-B)-> virtual-chassis vf-link-mode static
sw2 (6900-B)-> virtual-chassis chassis-id 2 vf-link 0 create
sw2 (6900-B)-> virtual-chassis chassis-id 2 vf-link 0 member-port 2/2/1
sw2 (6900-B)-> virtual-chassis chassis-id 2 vf-link 0 member-port 2/2/2
sw2 (6900-B)-> write memory

1 Like